Commit Graph
9 Commits
Author SHA1 Message Date
Hermes dc788e5dd3 DC-061: healthCheckUrl override + v2 production-grade backlog
CI / Test & Lint (push) Canceled after 0s
CI / Security audit (push) Canceled after 0s
- url-resolver.js: add healthCheckUrl priority (bypasses SSO for health checks)
- DC-PRODUCTION-GRADE-BACKLOG.md: v2 backlog with 19 tasks (DC-062–DC-080)
  based on full codebase audit: 1539 tests, 86.55% coverage, 0 ESLint errors

v2 backlog replaces completed v1 (P0-1 through P2-7 all done).
New priorities:
  P0: OpenAPI spec update, branch coverage gap, Dockerfile resource limits
  P1: Console sweep remainder, billing E2E test, graceful shutdown, lint sweep, health notification spam
  P2: CI/CD pipeline, Sentry, source maps, request logging, multi-stage Docker, health endpoint
  P3: WebSocket, i18n, config backup/restore, mobile, plugin system
2026-08-12 02:05:08 -07:00
Hermes dcf252e515 P2-5 through P2-7: mark done — all backlog items complete
CI / Test & Lint (push) Has been cancelled
CI / Security audit (push) Has been cancelled
2026-08-10 21:19:43 -07:00
Hermes 4dda005eb1 P2-1 through P2-4: mark done in backlog
CI / Test & Lint (push) Has been cancelled
CI / Security audit (push) Has been cancelled
2026-08-10 20:28:56 -07:00
Hermes bf1bcb1133 P1-3 through P1-8: mark done in production-grade backlog
CI / Test & Lint (push) Has been cancelled
CI / Security audit (push) Has been cancelled
2026-08-10 20:24:22 -07:00
Hermes 0bf4406253 P1-2: mark done in production-grade backlog
CI / Test & Lint (push) Has been cancelled
CI / Security audit (push) Has been cancelled
2026-08-10 15:50:03 -07:00
Hermes f9eaa324dd DC-059: mark done in BACKLOG + DC-PRODUCTION-GRADE-BACKLOG
CI / Test & Lint (push) Has been cancelled
CI / Security audit (push) Has been cancelled
2026-08-08 15:40:18 -07:00
Hermes 55a50fdeb7 P0-3, P0-4, P0-5: mark done in backlog
CI / Test & Lint (push) Has been cancelled
CI / Security audit (push) Has been cancelled
2026-08-08 03:36:52 -07:00
Hermes 8072c076e2 P0-2: mark done in backlog
CI / Test & Lint (push) Has been cancelled
CI / Security audit (push) Has been cancelled
2026-08-08 03:27:48 -07:00
Hermes a042645299 P0-1: mark done in backlog
CI / Test & Lint (push) Has been cancelled
CI / Security audit (push) Has been cancelled
2026-08-08 03:24:35 -07:00